Safe Drinking Water State Revolving Fund

SFY 2014-2015 Application

The previous 2013-2014 application can be found here.

Included below are the application materials for the 2014-2015 Safe Drinking Water State Revolving Fund (SDWSRF) Construction and Planning funding options. Please download and review your chosen application and all of its applicable enclosures. Please be advised that an application and all of its supplemental materials will only be accepted from water systems who received a May 2014 invitation to apply and who submitted a complete Statement of Intent by the invitation's specified deadline.


Planning Application Materials - Due September 29, 2014

A complete Planning application and all required application documents must be submitted (postmarked) no later than the above deadline. Electronic copies of the required documents will not be accepted via email.

  • 1p Application for Planning Funds (PDF) (Word)
  • 2p Application Guidelines and Instructions (PDF)
  • 3p Scope of the Project (PDF) (Word)
  • 4p Applicant Checklist (PDF) (Word)
  • 5 Certification for Water Metering (PDF) (Word)
  • 6 Map of Division of Drinking Water (DDW) District Offices (PDF)
  • 7 Guidelines for Green Infrastructure (PDF)
  • 8 Proposition 218 Information (PDF)
  • 9 Labor Compliance/Davis-Bacon Information (PDF) (Word)
  • 10 Technical, Managerial, Financial (TMF) Assessment Form and Criteria (PDF)
  • 11 Sample Resolution for Application (PDF) (Word)
  • 12 Engineering Firm Selection Process (Word)
  • 13 Consolidation Information (PDF)
  • 14 Uniform Relocation Act Information (PDF)

Construction Application Materials - Due December 29, 2014

A complete Construction application and all required application documents must be submitted (postmarked) no later than the above deadline. Electronic copies of the required documents will not be accepted via email.

  • 1c Application for Construction Funds (PDF) (Word)
  • 2c Application for Guidelines and Instructions (PDF)
  • 3c Applicant Engineering Report (PDF) (Word)
  • 4c Applicant's Checklist (PDF) (Word)
  • 5 Certification for Water Metering (PDF) (Word)
  • 6 Map of DDW Districts (PDF)
  • 7 Guidelines for Green Infrastructure (PDF)
  • 8 Proposition 218 Information (PDF)
  • 9 Labor Compliance/Davis-Bacon Information (PDF) (Word)
  • 10 Technical, Managerial, Financial (TMF) Assessment Form and Criteria (PDF)
  • 11 Sample Resolution for Application (PDF) (Word)
  • 12 Engineering Firm Selection Process (Word)
  • 13 Consolidation Information (PDF)
  • 14 Uniform Relocation Act Information (PDF)

Transition to Construction Application Materials (for Completed Planning Projects) - The deadline for the submittal of your construction application is listed in your SDWSRF invitation letter

For completed planning projects transitioning to construction, please use the construction application materials above. You may have already submitted some of the SDWSRF construction application elements as part of your SDWSRF planning project, such as complete plans and specifications or environmental documentation. If you have any questions about what documents are required to complete your SDWSRF construction application, consult with the following units.

DDW District Office
See Enclosure 6
for your CDPH District Office Contact Info

Safe Drinking Water State Revolving Fund - Drinking Water
Environmental Review Unit
State Water Resources Control Board
1001 I Street, MS 17A
Sacramento, CA 95814
Phone: (916) 449-5641
Email: Bridget.Binning@waterboards.ca.gov

Safe Drinking Water Office
Department of Water Resources
1416 Ninth Street, Room 816
P.O. Box 942836
Sacramento, CA 94236-0001
Phone: (916) 653-6273
Email: SDWO@water.ca.gov