|
Construction
Permit Frequently Asked Questions - San Diego Region
This
is a list of Frequently Asked Questions (FAQ) related
to the General Permit that have been encountered by
the San Diego Regional Water Quality Control Board
(SDRWQCB).
This FAQ serves as supplemental information to the
SWRCB's General Construction FAQ found at http://www.waterboards.ca.gov/stormwtr/constfaq.html
and Small (1-5 acres) Construction FAQ found at http://www.waterboards.ca.gov/stormwtr/smconstfaq.html
and Small LUP Construction FAQ found at http://www.waterboards.ca.gov/stormwtr/linearfaq.html.
The SDRWQCB strongly advises that you review both
of these links for additional information.
1.
Do you provide compliance assistance inspection?
Yes. Protecting our waters by promoting compliance
is our highest priority. After you have filed your
Notice of Intent (NOI) and received your Waste Discharge
Identification Number (WDID), and have fully implemented
your Storm Water Pollution Prevention Plan (SWPPP)
on your site, you are welcome to contact us for a
compliance assistance inspection. Our inspection teams
are divided into two areas. To arrange an inspection
north of (and including) the City of Carlsbad please
contact Water Resources Control Engineer Eric Becker
at (858) 492-1785. To arrange an inspection south
of (excluding) the City of Carlsbad please contact
Water Resources Control Engineer Benjamin Tobler at
(858) 467-2736. Inspections of this nature generally
result in a second, follow-up inspection to ensure
that all deficiencies are corrected. Compliance assistance
inspections are subject to staff availability.
2.
Can I use a SWPPP template to develop my SWPPP?
Yes. Carefully modifying a SWPPP template can significantly
reduce the cost of developing these site-specific
documents. A SWPPP template can be found at http://www.cabmphandbooks.com/Construction.asp.
The use of a template does not negate the need for
developing specific site information; please be aware
that you are responsible for providing accurate, site-specific
information within the SWPPP. You may wish to use
professional assistance (e.g., registered engineer)
in preparing the SWPPP. All sites that disturb one
acre or more must possess and implement a site specific
SWPPP throughout the construction period.
3.
When is the rainy season in the San Diego Region and
do I need to comply with the permit all year?
The rainy season occurs from October 1st through April
30th. Compliance with the permit is required year
round; however, the permit has different requirements
for the rainy and non-rainy season.
4.
When must I file the Notice of Termination (NOT) to
avoid paying another $700 annual fee?
A completed NOT documenting the completion of construction
activities (including photos of your site in full
post-construction compliance) must be submitted to
our San Diego office prior to your annual renewal
date. Our office "date and time" stamps
incoming correspondence and will waive renewals fee
if the NOT is complete and approved, and is submitted
before the renewal date.
Send
NOTs to:
California
Regional Water Quality Control Board
San Diego Region
9174 Sky Park Court, Suite 100
San Diego, CA 92123-4340
5.
How can I check to see if my fee payment is current?
Questions concerning billing and payment should be
directed to the SWRCB office at (916) 341-5536. Current
fee information can be found at http://www.waterboards.ca.gov/stormwtr/db/billing.mdb.
(Please note: Microsoft Access software is required
to view the database.)
6.
Why must I comply with both State and Municipal (i.e.
County or City) requirements?
Federal regulations mandate that both the State and
Municipal jurisdictions enforce pollution prevention
compliance at construction sites. Municipalities are
also regulated by the State and carry equal liability
for discharges of waste from private sites within
their jurisdictions. In other words, if the local
Municipality isn't conducting inspections and enforcing
it's local storm water ordinances, then that Municipality
is equally responsible for any discharge of waste
coming from your site and is liable for the same monetary
penalties. Recent regulatory cooperation between the
State and Municipalities has resulted in compliance
requirements that are more consistent region wide.
7.
Where do I send my Notice of Intent?
U.S.
Postal Service Address Overnight Mailing Address
State Water Resources Control Board State Water
Resources Control Board
Division of Water Quality Division Of Water Quality
Attn: Storm Water Section Attn: Storm Water, 15th
Floor
P.O. Box 1977 1001 I Street
Sacramento, CA 95812-1977 Sacramento, CA 95814
NOIs
are processed in the order they are received. A NOI
receipt letter will be mailed to the landowner within
approximately two weeks. Incomplete NOI submittals
will be returned to the landowner's address within
the same timeframe and will specify the reason(s)
for return. If you need a receipt letter by a specific
date (for example, to provide to a local agency),
we advise that you submit your NOI thirty (30) days
prior to the date the receipt letter is needed.
Please
do not call the State or Regional Boards to verify
your NOI status. A copy of your NOI receipt letter
will be available on the State Board web page within
twenty-four (24) hours of processing. Go to: http://www.waterboards.ca.gov/stormwtr/databases.html#const_db
to retrieve an electronic copy of your NOI receipt
letter.
8.
What is the Small Linear Underground/Overhead Project
Permit (LUP), and do I need to apply if I already
have coverage under the General Construction Permit?
The
LUP simplifies NOI and SWPPP requirements for both
private and Municipal entities that do linear (e.g.
utility) construction work. This permit will allow
one NOI and SWPPP for multiple, separate linear projects.
The permit is located on the SWRCB website at http://www.waterboards.ca.gov/stormwtr/construction.html
as adopted on June 18, 2003. Linear projects that
were active when the LUP was adopted and who were
already covered under the General Construction Permit
need not seek additional coverage under the LUP.
|