Central Valley Regional Water Board Performance Summary
Percentage of Targets Met
Area: 59344 square miles Budget: $32,102,492 Staff: 223.6
Permitting 60% Inspections 80% Others 70%
 
 
Total Maximum Daily Load and Basin Planning
Program Budget: $2,236,225 Program Staff: 18.60
  Target Actual Achieved % of Targets Met
Pollutant/Water Body Combinations Addressed 47 47 100%
Total Maximum Daily Loads Adopted 1 1 100%
Basin Plan Amendments Adopted 4 7 175%
No Regional Board Considerations Provided
NPDES Wastewater
Program Budget: $3,561,720 Program Staff: 25.20
  Target Actual Achieved % of Targets Met
Major Individual Permits Issued or Renewed 9 17 189%
Major Individual Facilities Inspected 51 29 57%
Minor Individual Permits Issued or Renewed 19 18 95%
Minor Individual Facilities Inspected 7 10 143%
Minor General Facilities Inspected 0 1 N/A
Target reflects the use of contractor help that was not available during FY 13/14.
NPDES Stormwater
Program Budget: $1,207,990 Program Staff: 10.40
  Target Actual Achieved % of Targets Met
Municipal (Phase I/II Inspections) 5 8 160%
Construction Inspections 385 654 170%
Industrial Inspections 195 243 125%
No Regional Board Considerations Provided
Waste Discharge to Land Wastewater
Program Budget: $3,395,431 Program Staff: 25.70
  Target Actual Achieved % of Targets Met
Waste Discharge to Land Inspections 174 220 126%
Individual Waste Discharge Requirements Updated 36 26 72%
The region experienced a vacancy of a key position mid-way through the fiscal year, received and processed a higher than anticipated number of applicants for general order enrollments (112 vs. 45), and increased its field presence in oil fields.
Land Disposal
Program Budget: $2,973,618 Program Staff: 21.50
  Target Actual Achieved % of Targets Met
Landfill Individual Permits Updated 9 18 200%
Landfill Inspections 73 150 205%
All Other Individual Permits Updated 5 1 20%
All Other Inspections 48 28 58%
Staff in Sacramento were redirected from permits to assist with two complex Cleanup and Abatement Orders (CAOs) for mines. Cleanup and Abatement Orders are not counted towards permit performance targets in the Land Disposal program. Staff inspected multiple unregulated facilities, but those sites are not included in the inspection counts.
Confined Animal Facilities (WDR, NPDES, etc.)
Program Budget: $1,477,285 Program Staff: 11.80
  Target Actual Achieved % of Targets Met
Confined Animal Facilities Inspections 350 496 142%
No Regional Board Considerations Provided
Timber Harvest (Forestry)
Program Budget: $1,379,065 Program Staff: 11.10
  Target Actual Achieved % of Targets Met
Timber Harvest Inspections 120 180 150%
No Regional Board Considerations Provided
Enforcement
Program Budget: $894,131 Program Staff: 6.00
  Target Actual Achieved % of Targets Met
Class 1 Priority Violations will Result in Formal Enforcement or an Investigative Order Pursuant to Water Code Section 13267 within 18 Months of Discovery 100 63 63%
Facilities with Over $12,000 in MMPs (4 or More Violations) Not Assessed within 18 Months of Accrual 0 5 0%
The target for “Facilities with 4 or more MMP violations Not Assessed within 18 Months of Accrual” is 0, actual achieved column shows number not addressed within 18 months. Number of facilities with 4 or more MMP violations that were addressed within 18 is not shown. RB5 staff are continuing to make improvements towards tracking violations--particularly the Class 1 violations--utilizing the State's CIWQS database. Enforcement staff at RB5 will continue to work with State Board staff to ensure that all Class 1 violations identified in CIWQS are responded to within 18 months. The five facilities identified as having four or more MMPs older than 18 months and not yet addressed are: Collins Pine (NOV issued 21 August 2014; received response 19 September 2014; issuance of ACL is pending); Pacific Sprouts (ACL issued 8 September 2014); Original 16-1 Mine (referred to AG's office); Atwater Regional WWTF (ACL to be issed 30 September 2014); and Stallion Springs WWTF (ACL to be issued 31 October 2014).
Cleanup
Program Budget: $5,343,525 Program Staff: 31.00
  Target Actual Achieved % of Targets Met
New Department of Defense Sites Into Active Remediation 63 60 95%
Cleanup Sites Closed 140 50 36%
New Underground Storage Tank Sites Into Active Remediation 45 55 122%
Underground Storage Tank Sites Projected Closed 105 127 121%
New Cleanup Sites Moved into Active Remediation 36 41 114%
94 DoD closures were inadvertently included in the target estimate. The Private Site Closure target was estimated at 46, which was achieved (50).