San Diego Regional Water Board Performance Summary
Percentage of Targets Met
Area: 3883 square miles Budget: $8,433,712 Staff: 62
Permitting 100% Inspections 89% Others 50%
The San Diego Water Board completed several other important projects in Fiscal Year 2013-14. In particular, the Board adopted a practical and measureable approach to achieve water quality in Loma Alta Slough through a non-TMDL solution that incorporates nutrient numeric endpoints. This achievement leveraged collaborations with cities, researchers and State agencies that also saw the publication of new indices of stream health based upon algae and an assessment of southern California estuaries that showed eutrophication is a major threat to beneficial uses. The San Diego Water Board also adopted an Amendment of a Master Reclamation Permit at Camp Pendleton allows the United States Marine Corps to increase their production of recycled water up to 7.5 million gallons per day, a 50 percent increase. In addition, improved regulatory oversight of many discharges were achieved through the adoption of Waivers of Waste Discharge Requirements for 12 classes of low threat discharges and the adoption of another comprehensive permit for a military base (Pt. Loma) that combines three prior permits. In addition, the lack of dedicated funding has not stopped the regulation of agricultural and nursery operations that contribute pollutants to downstream MS4s and receiving waters. This past fiscal year also saw the adoption of a revised permit for the U.S. International Boundary and Water Commission International Wastewater Treatment Facility (IWTF) Plant. This action was only possible after the successful attainment of secondary treatment standards at the IWTF and the conclusion of a lawsuit brought by the Board against the IBWC. In the dismissal hearing, presiding Judge Barry T. Moskowitz praised the San Diego Water Board and IBWC for achieving the goals expected by the public of good government service.
 
Total Maximum Daily Load and Basin Planning
Program Budget: $1,087,518 Program Staff: 8.80
  Target Actual Achieved % of Targets Met
Pollutant/Water Body Combinations Addressed 10 1 10%
Total Maximum Daily Loads Adopted 5 1 20%
Basin Plan Amendments Adopted 1 0 0%
NPDES Wastewater
Program Budget: $681,869 Program Staff: 5.10
  Target Actual Achieved % of Targets Met
Major Individual Permits Issued or Renewed 3 4 133%
Major Individual Facilities Inspected 14 16 114%
Minor Individual Permits Issued or Renewed 1 1 100%
Minor Individual Facilities Inspected 2 4 200%
Minor General Facilities Inspected 2 2 100%
No Regional Board Considerations Provided
NPDES Stormwater
Program Budget: $1,295,015 Program Staff: 11.00
  Target Actual Achieved % of Targets Met
Municipal (Phase I/II Inspections) 55 64 116%
Construction Inspections 125 151 121%
Industrial Inspections 85 105 124%
No Regional Board Considerations Provided
Waste Discharge to Land - Wastewater
Program Budget: $593,052 Program Staff: 4.70
  Target Actual Achieved % of Targets Met
Waste Discharge to Land Inspections 20 19 95%
Individual Waste Discharge Requirements Updated 0 0 N/A
No Regional Board Considerations Provided
Land Disposal
Program Budget: $416,806 Program Staff: 3.00
  Target Actual Achieved % of Targets Met
Landfill Individual Permits Updated 1 1 100%
Landfill Inspections 15 14 93%
All Other Individual Permits Updated 1 1 100%
All Other Inspections 1 0 0%
No Regional Board Considerations Provided
Confined Animal Facilities (WDR, NPDES, etc.) N/A
Program Budget: $0 Program Staff: 0.00
  Target Actual Achieved % of Targets Met
Confined Animal Facilities Inspections 0 1 N/A
No Regional Board Considerations Provided
Timber Harvest (Forestry) N/A
Program Budget: $0 Program Staff: 0.00
  Target Actual Achieved % of Targets Met
Timber Harvest Inspections 0 0 N/A
No Regional Board Considerations Provided
Enforcement
Program Budget: $106,717 Program Staff: 0.90
  Target Actual Achieved % of Targets Met
Class 1 Priority Violations will Result in Formal Enforcement or an Investigative Order Pursuant to Water Code Section 13267 within 18 Months of Discovery 100% 38% 38%
Facilities with Over $12,000 in MMPs (4 or More Violations) Not Assessed within 18 Months of Accrual 0 0 100%
The target for “Facilities with 4 or more MMP violations Not Assessed within 18 Months of Accrual” is 0, actual achieved column shows number not addressed within 18 months. Number of facilities with 4 or more MMP violations that were addressed within 18 is not shown.
Cleanup
Program Budget: $1,075,124 Program Staff: 7.90
  Target Actual Achieved % of Targets Met
New Department of Defense Sites Into Active Remediation 7 3 43%
New Cleanup Sites Moved Into Active Remediation 3 4 133%
Cleanup Sites Closed 1 7 700%
New Underground Storage Tank Sites Into Active Remediation 1 1 100%
Underground Storage Tank Sites Projected Closed 7 20 286%
No Regional Board Considerations Provided