Storm Water - Industrial Inspections

  • Under the County of Los Angeles MS4 permit, Permittees must inspect heavy industrial facilities within their municipalities (Part 4, Section C.2.b, on pages 31 to 32 of the permit). The Permittees must inspect these facilities at a minimum frequency of twice during the five year term of the permit, unless the Regional Board has inspected a facility within the past 24 months (see permit for details). To assist permittees in determining which facilities have been inspected by the Regional Board and when these inspections occurred, we are posting Excel and PDF files that show the dates of Regional Board inspections.
    • May 21 , 2005 - December 31, 2006 Inspections by the Regional Board in the Los Angeles County MS4 area
    • November 14, 2003 - May 20, 2005 Inspections by the Regional Board in the Los Angeles County MS4 area (excluding Long Beach)
    • June 28, 2000 - November 13, 2003 Inspections by the Regional Board in the Los Angeles County MS4 area (excluding Long Beach)
    • For the latest and/or customize lists, please use SMARTS.