Certification |
Leak rate of 0.1 gph with PD = 100% and PFA = 0%. |
Leak Threshold |
< 0.05 gph. Proprietary for dry test mode. |
Applicability |
Gasoline, diesel, aviation fuel, fuel oil #4, biodiesel B6-B20 meeting ASTM D7647 biodiesel B100 meeting ASTM D6751*.
Pipelines containing other liquids may be tested after approval from the manufacturer.
Lines can be tested either empty or partially filled with liquid. |
Specification |
System tests fiberglass, steel and flexible pipelines.
Dry Tests are conducted at 45 psi or 150% of operating pressure using the system as a digital manometer against the fluid and trapped vapor in the pipeline.
Mechanical line leak detector must be removed or manually isolated from pipeline for duration of test, or if testing is to be conducted with mechanical line leak detector in place, check valve in pump must be manually closed. |
Pipeline Capacity |
Maximum of 371.22 gallons in rigid piping.
Maximum of 109.8 gallons in flexible piping.
Maximum total of 481 gallons in combination rigid and flexible (the capacity of the flexible component cannot exceed 109.8 gallons).
Manifolded piping may be tested as long as the total length of piping is within the capacity and configuration limitations. |
Waiting Time |
None between delivery and testing.
None between dispensing and testing. |
Test Period |
Under ideal conditions, 3 minutes after installing in line.
Test data is collected continuously and recorded by computer.
Data is analyzed at the Leighton O'Brien analysis center with telemetry. |
Calibration |
No temperature sensors used.
System must be calibrated yearly in accordance with manufacturer's instructions. |
Comments |
Groundwater is overcome with pressure on the top of the fluid test system apparatus during the dry test. |