|
Certification
|
Leak
rate of 0.1 gph with PD = 95.24% and PFA = 0%.
|
|
Leak
Threshold
|
A
tank system should not be declared tight when the make-up
gas flow rate into ullage equals or exceeds 0.275 cubic
feet/hour.
|
|
Applicability
|
Gasoline,
diesel, aviation fuel, fuel oil #4.
Other liquids may be tested after consultation with the
manufacturer.
|
|
Tank
Capacity
|
Maximum
ullage volume is 7,500 gallons.
|
|
Waiting
time
|
Minimum
of 2 hours between delivery and testing.
|
|
Test
Period
|
Minimum
of 20 minutes, consisting of 2 consecutive 10-minute test
periods.
Test data are acquired and recorded manually.
There must be no dispensing or delivery during test.
|
|
Test
Pressure
|
Pressure
must be increased in ullage such that total pressure at
bottom of tank does not exceed 5.0 psi.
Pressure must be maintained for a minimum of 5 minutes
per 1,000 gallons of ullage.
At conclusion of this stabilization period, ullage pressure
must be reduced by 0.5 psi for remainder of test.
|
|
Temperature
|
Ullage
must be monitored for rate of temperature change, which
must not exceed manufacturer's tabulated values.
|
|
Groundwater
|
Depth
to groundwater in tank excavation backfill must be determined.
If groundwater is above product level, net pressure must
exceed 1 psi in the ullage during test.
If this requires more than 5 psi total pressure at tank
bottom, the ullage test must not be used.
|
|
Comments
|
Not
evaluated using manifolded tank systems. Evaluated using
diesel. Tests only ullage portion of tank. Product-filled
portion of tank must be tested using a volumetric underfill
test method.
|