Watr Quality Certification Project
FARAD DIVERSION DAM REPLACEMENT PROJECT
DRAFT ENVIRONMENTAL IMPACT PROJECT
- FIGURES
- 2-1 Regional Location
- 2-2 Proposed Project and Location
- 2-3 Project Diversion Elements
- 2-4 Boat/Debris Chute and Roughened Channels Cross Section
- 2-5 Intake Structure Concept
- 2-6 Fish Screen and Return
- 2-7 Construction Staging and Access
- 2-8 Flow Diversion Schematic
- 2-9 In-Kind Replacement
- 3-1 Major Tributaries above the Proposed Farad Diversion Dam
- 3-2 Flow at Floriston for the 3 Driest, Average, and Wettest Years
- 3-3 Annual Hydrograph at Floriston for Representative Normal, Wet, and Dry Years
- 3-4 Exceedance Probability at Floriston for the Driest, Average, and Wettest Years
- 3-5 Truckee River Diversions in the Operation Area
- 4-1 Simulated Average Daily Minimum, Mean, and Maximum Temperatures in the Truckee River for July and August
- 5-1 Geologic Map of the Construction Area
- 5-2 Existing Mass Movement Hazards
- 9-1 River Segments Used for Recreational Boating in the Vicinity of the Project Operation Area
- 9-2 Reduction in Average Number of Days per Month during which Kayaking and Rafting Flows are Met
- 10-1 Area of Potential Effect Map
- 13-1 Location of Existing Features within the Construction Study Area
- 13-2 Views of the Construction Area from River Left
- 13-3 Views of the Construction Area from River Right
- 13-4 Views of the Construction Area from the Community of Floriston.