UST Program - EVR Systems Determination Letters
A provision of Assembly Bill (AB) 2955 (Statutes 2004, Chapter 649) requires the Air Resources Boar (ARB) and State Water Resources Control Board (State Water Board) to determine collaboratively, to the best of their knowledge and using existing resources, that the equipment that meets the ARB’s Enhanced Vapor Recovery (EVR) requirements also meets underground storage tank (UST) statutory requirements. [Health and Safety Code (HSC), chapter 6.7, section 25290.1.2(a).] Below is a list of systems that have gone through the Multi Agency Review Process. The State Water Board found no evidence that these systems conflict with H&SC Chapter 6.7 section 25290.1.2(a).
Manufacturer |
Model |
Applicability |
Description of Operation |
Date of Determination Letter |
Healy Clean Air Separator, Model 9961 |
New EVR, Phase II System |
Stand alone device that assists in controlling vapor emissions from gasoline dispensing facilities. (E.O. VR-201-A) |
04/07/05 |
|
85000-1 Series Spill Container |
Modification to EVR, Phase I System |
Addition of 85000-1 Series spill container to currently certified Phil-Tite phase I Vapor Recovery System. (E.O. VR-101-D) |
06/30/05 |
|
Healy System, Inc. Including Veeder-Root In-Station Diagnostic (ISD) System |
New EVR, Phase II System |
ISD monitors the collection and containment of vapors by vapor recovery equipment (E.O. VR-202-A) |
08/31/05 |
|
500 L Series, 53 VML, and 1-2100 Series |
Modification to EVR, Phase I System |
Addition of fiberglass bucket around the 500 L Series spill container, protective guard outside of the bellows of 1-2100 Series spill container, and a non-substantive revision to the 53 VML ball float vent valve. (E.O. VR-102-E) |
08/31/05 |
|
| OPW Fueling Components, Inc. | Vaporsaver ORVR-Compatible | Modification to EVR, Phase II System | Change of fan material from plastic to aluminum, addition of a fan support bracket, and the use of cast aluminum for select components in place of machined aluminum. (E.O G-70-204.) |
11/03/05 |
| CNI Manufacturing | Stand Alone Direct Bury Spill Containment Models 205 & 214 | Modification to EVR, Phase I System | Addition of ductile iron stand-alone (direct bury) spill container. This stand-alone direct bury can only be used for applications where the secondary containment of the fill riser is not required. (E.O VR-104-B.) |
09/14/05 |
| Emco Wheaton Retail | EVR Phase I System | New EVR, Phase I System | Complete Phase I EVR System with integral overfill prevention (flapper valve) and spill containment, available in direct-bury and multi-port configurations. |
08/08/06 |
| Franklin Fueling Systems - Phil-Tite | Phil-Tite EVR Phase I System | Modification to EVR, Phase I System | Addition of EBW's Auto Limiter II Overfill Prevention Drop Tube and other EBW Phase I components to the Phil-Tite EVR Phase I System. | |
| Healy Systems, Inc. | Healy Clean Air Separator | Modification to EVR, Phase II System | Addition of Mode1 807 Swivel Breakaway and 1302 Flow Limiter to the Healy Phase II EVR System. | |
| OPW Fueling Components, Inc. | OPW Phase I EVR System | Modification to EVR, Phase I System | Addition of a remote fill configuration and minor modification of several existing components. 61SO overfill prevention valve has been modified slightly and is now called 71SO. | |
| CNI Manufacturing | CNI Phase I EVR System | Modification to EVR, Phase I System | Addition of Emco Wheaton overfill prevention valve and swivel adaptor to CNI Phase I EVR system. | |
| Vapor System Technologies, Inc. | VST Phase II EVR System | New EVR, Phase II System | Phase II EVR System with membrane processor, for use with balance dispensers. | |
| INCON | INCON Vapor Recovery Monitoring System | New EVR, Phase II System | ISD monitors the collection and containment of vapors by vapor recovery equipment. | 12/20/07 |
| Husky Corp. | 5885 Pressure/Vacuum Vent | Modification to EVR, Phase I System | Update of Model 4885 P/V Valve | 1/28/08 |
| Beaudreau Electric, Inc. | BEI PV-Zero | Modification to EVR, Phase I System | Closes off the tank vent unless pressure or vacuum level exceeds allowable thresholds. | 1/28/08 |
| Veeder-Root | VST including Veeder-Root In-Station Diagnostics (ISD) System | New ISD system for Approved Phase II EVR Assist and Balance Systems | ISD monitors the collection and containment of vapors by vapor recovery equipment. (EO. VR202-E) | 3/26/08 |
For more information regarding UST vapor recovery program, visit the Air Resources Board's web site.