Storm Water Program
2009-0009-DWQ Construction general permit
- Risk Assessment R-Factor Calculation Notification
- Order 2012-0006-DWQ (amends 2009-0009-DWQ as amended by 2010-0014-DWQ)
- Order 2010-0014-DWQ (amends 2009-0009-DWQ)
- Adopted Order 2009-0009-DWQ (As amended by 2010-0014-DWQ and 2012-006-DWQ)
- Fact Sheet
- Order
- Attachment A – Linear Underground/Overhead Requirements
- Attachment A.1 – LUP Type Determination
- Attachment A.2 – LUP Permit Registration Documents
- Attachment B – Permit Registration Documents
- Attachment C – Risk Level 1 Requirements
- Attachment D – Risk Level 2 Requirements
- Attachment E – Risk Level 3 Requirements
- Attachment F – Active Treatment System (ATS) Requirements
- Appendix 1 – Risk Determination Worksheet (Excel)
- Appendix 2 – Post-Construction Water Balance Performance Standard
- Appendix 2.1 – Post-Construction Water Balance Performance Standard
( PDF | Excel )
(Note: The Post-Construction Water Balance Calculator is now provided electronically in SMARTS at https://smarts.waterboards.ca.gov)
- Appendix 2.1 – Post-Construction Water Balance Performance Standard
( PDF | Excel )
- Appendix 3 – Bioassessment Monitoring Guidelines
- Appendix 4 – Adopted/Implemented Sediment TMDLs
- Appendix 5 – Glossary
- Appendix 6 – Acronyms
- Appendix 7 – State and Regional Water Resources Control Board Contacts
- Guidance
- Risk Assessment Map References
- QSD/QSP Training/Exam Information
- 2009-0009 DWQ General Permit – Frequently Asked Questions
- Linear Underground/Overhead Project Flowcharts
- Bioassessment Index Period Map
- Previous Drafts and Comments
Questions or comments?
Please contact the Construction Storm Water Unit by email at: stormwater@waterboards.ca.gov or by phone at: (916) 341-1866 or (866) 563-3107.




