Storm Water Program
HISTORICAL DOCUMENTS
This web page contains historical documents of the Storm Water Program. Search for your document in the following areas of interest or search for a document by pressing Ctrl+F and typing in a keyword.
General Information | Construction | Industrial | Municipal
General Information
- On August 28, 2008, the Orange County Superior Court, in a written ruling, directed that Writ of Mandate shall be modified to eliminate an injunction requiring the State Water Resources Control Board (State Water Board) to "cease, desist and suspend all activities relating to the implementation, application, and/or enforcement of the Standards in the [Los Angeles Regional Water Quality Control Board's] Basin Plan, as applied or to be applied to Stormwater." This injunction had prohibited the State Water Board from conducting a number of storm water regulatory activities, including the processing of certain water quality petitions and the adoption or enforcement of certain NPDES storm water permit provisions. With the new court order, full implementation of the State Water Board’s pre-existing storm water regulatory program has resumed.
- On August 1, 2008, the Orange County Superior Court issued an order limiting the effect of a Writ of Mandate, and allowing the processing of Notices of Intent (NOIs) and Notices of Terminations (NOTs). The Writ of Mandate had ordered the State Water Resources Control Board to "cease, desist and suspend all activities relating to the implementation, application, and/or enforcement of the Standards in the [Los Angeles Regional Water Quality Control Board's] Basin Plan, as applied or to be applied to Stormwater." This injunction had prohibited the approval of NOIs and NOTs in the Los Angeles Region under the Statewide National Pollutant Discharge Elimination System Construction, Small Linear Utility, and Industrial Storm Water General Permits. With the new court order, processing of these documents has resumed.
- On July 2, 2008, the Orange County Superior Court issued a Writ of Mandate ordering the State Water Resources Control Board (State Water Board) to “cease, desist and suspend all activities relating to the implementation, application, and/or enforcement of the Standards in the [Los Angeles Regional Water Quality Control Board’s] Basin Plan, as applied or to be applied to Stormwater.” This injunction prohibits the approval of Notices of Intent (NOIs) and Notice of Terminations (NOTs) in the Los Angeles Region under the Statewide National Pollutant Discharge Elimination System Construction, Small Linear Utility, and Industrial Storm Water General Permits.
- Public Availability of Storm Water Management Plans & Storm Water Pollution Prevention Plans
- CEPA Guidance for the Ninth Circuit's Decision, April 16, 2004
- EPA's NPDES Storm Water Program Questions and Answers, January 21, 2004
- Storm Water Pollution and Solutions Brochure
- Urban Management Measures by the Non Point Source Program
- Introduction to Storm Water Pollution: Causes and Solutions
Construction
- Board Approved Changes from September 2, 2009 Board Meeting
- 2009 Draft NPDES Construction General Permit
- Notice of Board Meeting
The State Water Resources Control Board will consider adopting the proposed Draft General Permit for Discharges of Storm Water Associated with Construction Activities (Draft Construction General Permit, or CGP). The meeting was held on Wednesday, September 2, 2009, 9:00 AM at the Cal/EPA Headquarters Building, 1001 I Street, 2nd Floor, Sacramento, CA 95814 - Comments Received on the 2009 Draft Construction General Permit
- Notice of Public Hearing - Comment period closed on June 24, 2009 at 5 p.m.
- CGP Errata Sheet
- The 2009 Draft NPDES Construction General Permit
- Fact Sheet
- Order
- Attachment A – Linear Underground/Overhead Requirements
- Attachment A.1 – LUP Project Type Determination
- Attachment A.2 – LUP Permit Registration Documents
- Attachment B – Permit Registration Documents
- Attachment C – Risk Level 1 Requirements
- Attachment D – Risk Level 2 Requirements
- Attachment E – Risk Level 3 Requirements
- Attachment F – Active Treatment System Requirements
- Appendix 1 – Risk Determination Worksheet
- Appendix 2 – Sediment Basin Sizing
- Appendix 3 – Rain Event Action Plan Templates
- Appendix 4 – Post-Construction Water Balance
- Appendix 4.1 – Post-Construction Water Balance Calculator
- Appendix 4.1 (unlocked version)
- Appendix 5 - Bioassessment
- Appendix 6 – Adopted/Implemented Sediment TMDLs
- Appendix 7 – Glossary
- Appendix 8 - Acronym List
- Notice of Board Meeting
- Guidance
The following nonsubstantive files have been added: - 2008 Draft NPDES Construction General Permit
- Public comments received on the March 18, 2008 Draft Construction Permit
- Revised Notice of Staff Workshop and Hearing: Comment period closed on June 11, 2008 at Noon..
- Fact Sheet [ pdf ] [ word ]
- Order [ pdf ] [ word ]
- Attachment A - Receiving Water (RW) Risk Factor Worksheet
- Attachment B - Monitoring Program and Reporting Requirements [ pdf ] [ word ]
- Attachment C - Turbidity Numeric Action Level
- Instructions [ pdf ] [ word ]
- Spreadsheet
- Attachment D - Sediment Basin Sizing [ pdf ] [ word ]
- Attachment E - Active Treatment System (ATS) Requirements [ pdf ] [ word ]
- Attachment F - New and Re-development Performance Standard Spreadsheet
- Instructions [ pdf ] [ word ]
- Spreadsheet
- Attachment G - Rain Event Action Plan (REAP) [ pdf ] [ word ]
- Attachment H - Storm Water Pollution Prevention Plan (SWPPP) Requirements [ pdf ] [ word ]
- Attachment I - Standard Provisions [ pdf ] [ word ]
- Attachment J - Active Treatment System (ATS) Coagulants [ pdf ] [ word ]
- Attachment K - NOI and Instructions [ pdf ] [ word ]
- Attachment L - Glossary [ pdf ] [ word ]
- Attachment M - Acronym List [ pdf ] [ word ]
- 2008 Workshops
- Preliminary Draft NPDES Construction General Permit
- Fact Sheet (PDF)
- Order
- Turbidity MUSLE Calculator (Excel)
- Volume Calculator (Excel)
- Workshops
- Notice of Public Workshop - Comment period closed on May 4, 2007 at 5 p.m.
- April 17, 2007 - Rancho Cucamonga
- April 20, 2007 - Sacramento
- Public Comments
- Notice of Public Workshop - Comment period closed on May 4, 2007 at 5 p.m.
- Aquatic Toxicity of Common Compounds Used in Construction - This data has been compiled by the Regional Department of Fish and Game in Yountville, California, and has been used to help enforce Fish and Game Code Section 5650
- Conference on Advanced Treatment for Construction Sites, October 21, 2004
- Modifications to the Fact Sheet of the National Pollutant Discharge Elimination System General Permit (NPDES) for Discharges of Storm Water Associated with Construction Activities Order No. 99-08-DWQ (CGP).
- Fact Sheet
- Responses to Comments on the February 13, 2004 Draft - Received by March 30, 2004
- Responses to Comments on the May 8, 2004 Draft
- Conference on Advanced Treatment for Construction Sites, October 21, 2004
- Effluent limitations Guidelines and New Source Performance Standards for the Construction and Development Category, April 26, 2004
- 92-08-DWQ Expired Construction General Permit
Industrial
Municipal
- Guidance for Municipal Storm Water Funding - Prepared by National Association of Flood and Storm Water Management Agencies, January 2006
- NPDES Storm Water Cost Survey Final Report
- Summary of Written Comments Received from the Listening Sessions for the Draft Policy for the Implementation of the Storm Water Program
- Development of a Draft Policy for the Implementation of the Storm Water Program, November 19, 2004
- Workshop Presentations, 6/27/03
- The Basics - Permit Overview
- Getting Coverage - Deadlines, Public Review, Approval
- The Foundation - Developing and Implementing Your SWMP
- Measurable Goals - Setting, Achieving and Evaluating
- From the Beginning - Design Standards and Post-Construction
- Response to Comments on the March 19th Draft, 5/9/03
- Small Municipal Storm Sewer System General Permit 4th Draft, 3/21/03
- As a result of a recent Ninth Circuit Court of Appeals ruling, our Board has directed staff to withhold presenting the Phase II Small MS4 General Permit to the Board for consideration of adoption on February 4, 2004. (1/28/03)
- Cover Letter, 1/9/03, regarding the 3rd version of the Draft National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges of Storm Water from Small Municipal Separate Storm Sewer Systems (MS4s).
- Draft NPDES General Permit for Discharges of Storm Water from MS4s, 3rd Version, 1/9/03
- Response to Comments on the Draft NPDES General Permit for Discharges of Storm Water from MS4s, 1/9/03.
- Phase II Urbanized Area Maps, 1/3/03
- The Small MS4 General Permit was not adopted by the SWRCB at the December 2, 2002 Board Meeting, 12/10/02
- Revised Draft National NPDES General Permit for Discharges of Storm Water from Small Municipal Separate Storm Sewer Systems, 10/28/02
- Summary of the Major Changes to the Draft NPDES General Permit for Discharges of Storm Water from Small Municipal Separate Storm Sewer Systems, 10/28/02
- Phase II Small MS4 PowerPoint Presentations, 9/9/02
Return to Storm Water Homepage
