California WaterFix Hearing Exhibit No. DWR-1036

ITP Application documents were downloaded by hearing team staff on December 8, 2017 from DWR’s project web site http://www.californiawaterfix.com/wp-content/uploads/2017/10/CWF_2081b_TOC.pdf

CHAPTERS

FIGURES

 

APPENDICES

Document Name
Appendix 2.A: Evaluation of Species Considered for Coverage
Appendix 3.A: Mapbook for the Proposed Action
Appendix 3.B: Conceptual Engineering Report, Dual Conveyance Facility, Modified Pipeline/Tunnel Option-Clifton Court Forebay Pumping Plant (MPTO/CCO), Volume 1
Appendix 3.C: Conceptual Engineering Report, Dual Conveyance Facility, Modified Pipeline/Tunnel Option-Clifton Court Forebay Pumping Plant (MPTO/CCO), Volume 2
Appendix 3.D: Construction Schedule for the Proposed Project
Appendix 3.E: Pile Driving Assumptions for the Proposed Project
Appendix 3.F: General Avoidance and Minimization Measures
Appendix 3.G: Geotechnical Exploration Plan – Phase 2
Appendix 4.A: Longfin Smelt Quantitative Analyses
Appendix 4B: Terrestrial Impact Analysis Methods
Appendix 4C: Information to Support the Cumulative Effects Analysis for Terrestrial Species
Appendix 4.D: Comparison of Key Hydrological Variables for Proposed Project with Longfin Smelt Spring Outflow Criteria to No Action Alternative and Proposed Project Scenarios
Appendix 6.A: Adaptive Management Framework for the California Water Fix and Current Biological Opinions on the Coordinated Operations of the Central Valley and State Water Projects
Appendix 6.A, Attachment 1: Implementation Schedule for the Adaptive Management Program for the Existing Biological Opinions and CESA Authorizations for the Longterm Operation of the CVP and SWP and for CWF

MATERIALS INCORPORATED BY REFERENCE

  (Page last updated 12/11/17)

 
.