Purpora Engineering, Inc. (originally listed as Heath Consultants, Inc.)

Petro Tite Line Tester

LINE TIGHTNESS TEST METHOD

Certification Leak rate of 0.1 gph with PD = 99.99% and PFA = 0.34%.
Leak Threshold 0.05 gph. 
A pipeline system should not be declared tight if the test result indicates a loss that equals or exceeds this threshold. 
Vendor claims this equipment can detect leaks at .01 gph, and trains operators to declare leaks at .01 gph.
Applicability Gasoline, diesel, aviation fuel, fuel oil #4.
Specification System tests fiberglass and steel pipelines. 
Tests are conducted at 150% operating pressure. 
Mechanical line leak detector must be removed from pipeline for duration of test.
Pipeline Capacity Maximum of 129 gallons.
Waiting Time None between delivery and testing. 
None between dispensing and testing.
Test Period Minimum of 1 hour pretest for 3 inch diameter fiberglass piping in accordance with Petro Tite test procedures. Pretest is not required for steel piping and not required for fiberglass piping with a diameter less than 3 inches. Minimum of 30 minute (two 15 minute readings) test when the detected leak does not exceed 0.005 gph, or minimum of 1 hour (four 15 minute readings) test when the detected leak is more than 0.005 gph for the first 30 minutes.Test data are acquired and recorded manually..
Calibration System must be checked annually and, if necessary, calibrated in accordance with manufacturer's instructions.

 

Purpora Engineering, LLC

Evaluator:  Ken Wilcox Associates

P.O. Box 170591

Tel:  (816) 443-2494

Milwaukee, WI 53207

Dates of Evaluation:  03/11/91, 05/06/01

Tel: (800) 352-2011

 

E-mail: sap@purporaengineering.com  
URL: www.purporaengineering.com  
 

 | Home | Vendors: A - F | Vendors: G - M | Vendors: N - S | Vendors: T - Z | Method Index |

Appearance on this list is not to be construed as an endorsement by any regulatory agency nor is it any guarantee of the performance of the method or equipment.
Equipment should be installed and operated in accordance with all applicable laws and regulations.
For full details, please refer to our expanded "DISCLAIMER" page.