Los Angeles River Upper Reach 2
- Approval Confirmation of Los Angeles River Upper Reach 2 WMP (November 14, 2024)
- Conditional Approval of the Los Angeles River Upper Reach 2 WMP (May 1, 2023)
Contacts
Program Supervisor:
Vacant
-
Staff
Alireza Rahmani
(213) 576-6692
Water Resource Control Engineer
Angineh Shahnazarian
(213) 576-6617
Environmental Scientist
Erum Razzak
(213) 620-2095
Environmental ScientistFarzad Kasmaei
(213) 576-6695
Water Resource Control EngineerHarumi Goya
(213) 620-2283
Engineering Geologist
Jessica Pearson
(213) 576-6786
Water Resource Control Engineer


