CV-SALTS
San Joaquin River Upstream of Vernalis

June 2017 Salt & Boron Basin Plan Amendment - Phase 2

Technical Reports

  • CV-SALTS Agenda Item Staff gave a presentation on the draft technical report, Salt Tolerance of Crops in the Lower San Joaquin River (Stanislaus to Merced Reaches), as part of a joint meeting with Central Valley Salinity Alternatives for Long Term Sustainablity (CV-SALTS). The meeting was held on 11 March 2010.