Carlsbad Desalination Plant Appendices to the Report of Waste Discharge

List of Appendices to the ROWD

ROWD Appendices submitted on September 4, 2015

  • Appendix A - Compliance with Ocean Plan Amendments (Errata in Appendix JJ below)
  • Appendix B - Intake Discharge Feasibility Report (Addendum in Appendix II below)
  • Appendix C - Hydrodynamic Discharge Study
  • Appendix D - Coastal Process Effects of Reduced Intake
  • Appendix E - NPDES Order No. R9-2011-0028
  • Appendix F - Water Circulation in Agua Hedionda Lagoon
  • Appendix G - Acute Toxicity Study
  • Appendix H - Chronic Toxicity Study
  • Appendix I - Brine Dilution Salinity Tolerance
  • Appendix J - Fish-Friendly Pumping
  • Appendix K - Intake/Discharge Entrainment Analysis
  • Appendix L - CFD Modeling of Flow Augmentation System
  • Appendix M - Anti-degradation Analysis
  • Appendix N - Life Cycle Cost Analysis (Revised in Appendix OO below)
  • Appendix O - NPDES Order No. R9-2009-0038
  • Appendix P - Flow, Entrainment, Impingement Minimization Plan
  • Appendix Q - Final EIR
  • Appendix R - California Coastal Commission Approval of Marine Life Mitigation Plan
  • Appendix S - Hydro-geologic Investigation SDG&E Encina Power Plant, Carlsbad, CA
  • Appendix T - Drought Proofing Through Desalting the SDG&E Approach
  • Appendix U - Huntington Beach Desalination Project, ISTAP Phase I & II Reports
  • Appendix V - U.S. Fish and Wildlife Service MOU
  • Appendix W - SDCWA 2010 Urban Water Management Plan and 2013 Facilities Master Plan Update
  • Appendix X - Construction Cost Estimates for Intake/Discharge Alternatives
  • Appendix Y - Implementation Schedules for Intake/Discharge Alternatives
  • Appendix Z - Proposed Monitoring and Reporting Plan

ROWD Appendices submitted on August 18, 2016

  • Appendix AA - California Coastal Commission Approval of CDP
  • Appendix BB - Revised hydrodynamic Discharge Modeling Report
  • Appendix CC - Encina Wastewater Authority Response to Request for Information regarding the Encina Ocean Outfall as a Brine Discharge Alternative for the Carlsbad Desalination Plant
  • Appendix DD - Analysis of Potential for CDP Discharge to Cause Hypoxic Conditions
  • Appendix EE - Comparison of Fish Return Options
  • Appendix FF - Fish Return System Cleaning Methods
  • Appendix GG - Larval Fish Residence Time in Agua Hedionda Lagoon
  • Appendix HH - Entrapment Evaluation
  • Appendix II - Addendum to Intake Discharge Feasibility Report
  • Appendix JJ - Appendix A Errata
  • Appendix KK - Draft Final SEIR
  • Appendix LL - Draft Response to Comments
  • Appendix MM - Draft Findings of Fact
  • Appendix NN - Draft Mitigation Monitoring and Reporting Program
  • Appendix OO - Revised Life Cycle Cost Analysis
  • Appendix PP - Intake/Discharge Design Modifications

ROWD Appendices submitted after August 18, 2016

  • Appendix QQ - Response to Questions Regarding CDP Discharge Modeling Reports (Revised February 21, 2017)
  • Appendix RR - Feasibility Assessment of Alternative Brine Discharge to the Encina Ocean Outfall
  • Appendix SS - Feasibility Assessment of Wedge Wire Screen (WWS) Intake in Agua Hedionda Lagoon
  • Appendix TT - Fish Return System Discharge Location Alternatives Analysis
  • Appendix UU - Brine Mixing Zone Habitat Assessment (Revised January 18, 2017)
  • Appendix VV - Establishing the Location of the Zone of Initial Dilution for Stand-Alone Operation (Revised March 14, 2017)
  • Appendix WW - Brine Discharge Mortality Calculations
  • Appendix XX - Current and 2065 Area BMZ and Wetlands Restoration Project
  • Appendix YY - Marine Life Mortality Comparison between the Proposed Screening Location and the Lagoon Screen Locations
  • Appendix ZZ - Marine Life Mortality Report and Mitigation Calculation (Rev. 1)
  • Appendix AAA - Fish Return Anti-degradation
  • Appendix BBB - Evaluation of Intake Alternatives 1, 15-20
  • Appendix CCC - Evaluation of Intake Alternatives 1, 11-14
  • Appendix DDD - Feasibility Assessment of Carlsbad Desalination Plant Intake and Discharge
  • Appendix EEE - Revised Feasibility Assessment for Intake Alternatives 1, 15, and 21
  • Appendix FFF - Revised Area of Production Foregone Calculations
  • Appendix GGG - Revised Entrainment Analysis for Brine Discharge Options
  • Appendix HHH - Relative Salinity Impacts in the BMZ for Variable Discharge Rates